Itong house ready-made projects. House, turnkey construction, from yutong aerated blocks: the benefits are obvious

The construction company "ECOS" is engaged in the construction of houses from YTONG aerated concrete, therefore, at the time of drawing up the project, it is necessary to take into account specifications and properties of gas blocks. Projects for aerated concrete houses are drawn up in accordance with the standards and regulations of YTONG technology, since the company’s employees are certified YTONG partners.

Guarantees for clients of the company "ECOS"

For the construction of each aerated concrete house, projects are not limited to specific frameworks and requirements, so all clients have the opportunity to turn into reality any requirements regarding the layout, area of ​​the building and arrangement of rooms.

Projects aerated concrete houses turnkey solutions are not limited to standard options, but are based on company standards and regulations. all projects small houses tested and implemented repeatedly, so clients can be confident in creating an energy-efficient, durable and safe home made of aerated concrete.

Project production time country houses from aerated concrete can take several working days, depending on the level of complexity of the architectural documentation. For project preparation country house from aerated concrete can be affected by the area of ​​construction, the level of technical complexity and the presence of personal wishes regarding construction.

For a house made of aerated concrete, projects and prices will include a full package of technical and architectural documentation that will be required during the construction of a country house made of aerated concrete. The construction of a house and the preparation of a project for a house are always accompanied by long-term warranty obligations, so all clients receive a guarantee for a period of about 5 years, as well as long-term warranty service.

The main advantages of working with the ECOS company

Construction company "ECOS" offers cooperation to private and corporate clients who wish to organize construction capital house from aerated concrete. At the disposal of clients ready-made projects houses made of aerated concrete with simple standard design or individual turnkey layout.

Thanks to the partnership construction company"ECOS" with the YTONG brand, all clients have the opportunity to buy ready-made projects of aerated concrete houses for the organization capital construction. We decided to buy ready-made projects for aerated concrete house? Appreciate all the advantages of the ECOS company:

  • an individual approach to the production of an aerated concrete house project for each client;
  • preparing a financial estimate for the house and drawing up an agreement under which payment is made;
  • warranty obligations for each home;
  • professional specialists who are well aware of YTONG house construction technologies.

Are you interested in the prices for preparing a house project? Call or write to the construction company manager to agree on the timing of creating a house project and order individual project own home.

That is, from gas silicate and foam concrete blocks in Lately very popular. Is there a difference which gas silicate blocks to build a house from? Why are some blocks better or worse than others? And is it worth paying attention to this?

What is the difference between block manufacturers?

Gas silicate blocks different manufacturers differ in the accuracy of geometric dimensions, quality of gas silicate and price. There are several factories in Russia that produce gas silicate blocks High Quality. These include Ytong factories. Let's discuss why this is important and why you shouldn't skimp on the quality of your blocks.

Why are quality issues so important for gas silicate blocks?

Construction with gas silicate is always a compromise between strength and warmth. The strength of gas silicate blocks, which are used for the construction of country houses, is at the lower limit allowed by the design documentation. If you build a house from low-quality blocks, the strength of which is one and a half to two times worse than indicated in project documentation, then the building will develop like a house of cards. And such blocks are easily obtained if the technology for their production is not strictly followed.

How are gas silicate blocks made? In a prepared mixture of lime, sand, water and a gas-forming agent (aluminum paste), the result is chemical reaction Gas bubbles form, after which the mixture hardens in an autoclave, and the hardened mass is cut into blocks on special machines. Even with small deviations in technology, blocks can be obtained whose strength is significantly lower than declared. Their use in construction can lead not only to cracks in the walls, but also to the complete destruction of the building.

The exact geometry of the blocks is important for heat conservation. The fact is that the thermal conductivity of gas silicate is much less than the thermal conductivity of cement mortar. If you lay on cement mortar, then the thickness of the masonry joints will be about 1 cm. High accuracy geometric dimensions allows masonry to be carried out using special glue, rather than cement mortar, while gaining up to 15-20% of heat by reducing the thickness of masonry joints to 2-3 mm.

The good quality of the blocks is reflected in the price, because complex and high-precision equipment for their production costs a lot. Cheap blocks, in principle, cannot be of good quality.

Quality control is very important

From the above it follows that quality control of gas silicate blocks in production is extremely important. The block manufacturer must have a modern, actually working production laboratory to control product quality.

The Ytong company has its own well-equipped laboratory and constantly monitors the quality of the blocks produced, primarily their strength characteristics. Therefore, the construction of houses from ytong blocks does not present any unpleasant surprises. Projects of houses made from ytong have quite predictable indicators in terms of strength and heat saving.

Technological features of building houses from ytong blocks

When building houses from foam blocks, a number of problems have to be solved. In the places where the floor slabs are supported, monolithic belts must be installed in order to evenly distribute the pressure on the walls. These belts are “cold bridges” and must be insulated. It is also necessary to insulate the lintels over window and door openings. If this is not done, the walls will become damp during the cold season.

Ytong strives to help solve these and other problems that arise during construction and make the construction process as technologically advanced as possible. She developed standard gas silicate lintels for window and doorways, a special floor system that does not require the installation of monolithic belts and does not form “cold bridges”. Their use saves time and labor costs when building houses from ytong blocks.

Comprehensive support for builders

Ytong not only produces quality blocks and components. Its market policy is characterized by comprehensive support for builders.
Builders and consumers are kept up to date with all the company's new products. Ytong regularly releases albums, manuals, and demo videos in which it tries to show all the intricacies of the technology for building houses from gas silicate blocks and finishing them. The company not only does advertising, but also makes sure that Ytong products are used correctly and serve people well.

Build houses from Ytong blocks with us!

The Country House company has great experience construction of houses from ytong blocks. If you value quality and want to build a house from foam blocks, ytong blocks are the best choice. We will be glad if you entrust the construction of your house from these blocks to us.

4. Project
The layout was initially tailored to certain requirements. The kitchen should be corner, one side should face the entrance to the site and the area in front of the house, the second - towards the bathhouse and the area in front of the bathhouse. This was all done for my wife, because I see how difficult it is for her to manage the house alone with the children. With this arrangement, she will be able to cook in the kitchen and observe almost the entire territory of the site, so that she can let the children out for a walk. The area not covered by the view from the kitchen includes only two rear sides of the house, where the fence is 7 and 4 meters away, respectively. The rest of the layout was drawn based on the location of the kitchen and the entrance to the house from the main (front) facade. Thus, the layout of the 1st floor was born. I decided to make the second floor a full-fledged one, because I needed 3 rooms of good size, a bathroom, and in the future more than one. I didn’t make it into an attic, because it’s more expensive to insulate and there’s less volume, but I decided to make it cold attic, which can later be converted into an attic 3rd floor. Enough for four big house it turns out, although the useful area of ​​the first floor is slightly more than 60 sq. m. m. But firstly, we plan not to stop with two children, and secondly, expanding the boundaries of the house to increase the area was already irrational due to the location on the site. In addition, the 2nd floor will remain cold and completely unfinished for financial reasons. And prepare 60 sq. m. for living seems to me not a very difficult matter and I hope I have enough finances to do it before the cold weather.
Floors of the first floor: anticipating this question, I will write the following. Since the foundation was formed from the advice of experienced people and was calculated by the designer, it was not discussed. I have a slab with the ribs up. What can be done: overlap is enough expensive pleasure, so I decided to simply fill the space between the ribs with sand until required level. The asking price is 4 KAMAZ sand trucks, 4 thousand rubles each. A screed would be needed on any floor, so I don’t include it in the price. Well, still work. Let there be 20 thousand. finished floor under the screed with the ability to make small cavities for storing something. Wooden floor I didn’t consider it because I will be heating it through heated floors without radiators. And wood is more expensive, less durable and requires maintenance.
The design part of the project is missing, but here I used Ytong support - I used the album technical solutions and consultations hotline and Ytong designers. This is all unusually free for the Russian average person, but knowing the German mentality, I don’t see a catch in this. I think the high cost of Ytong pays for all these services.
The result is a project that I painfully drew while simultaneously studying Archicad, which has changed 100 times and still some points have not been determined. I must say that this has already had its effect on the construction site - I now have an extra row of blocks on the 1st floor (floor height is outside The walls I got were 13 blocks or 3.25 meters. I plan to make the useful height of the floor 2.95 m. The result will be a thick floor (due to additional backfilling with sand). Basic internal parameters- height to the window sill in living quarters and kitchen - 90 cm (except for the bathroom - 140 cm and window 80 by 100 cm), window height 150 cm, window width from 130 to 200 cm, depending on the layout. The height from the ceiling to the top edge of the window is 50 cm (2 blocks). I had not yet thought through ventilation and chimneys in the project, at the moment construction began, the need for all this dawned on me and I allocated space for two ventilation and chimney shafts and laid reinforcement in the ribs (outlets) to increase the ribs in the place where these shafts would be installed so that it was possible to build them out of brick if necessary.
I provided communication inputs and outputs in the slab: 1 sewerage system, 1 backup sewerage system through which the plastic pipe with water and 1 plastic pipe 40 mm for electrical cable. I plan to install a septic tank due to finances at the end of construction, since this is not the most important thing for entering the house. Our bathhouse is equipped with a toilet with a shower (there is a separate septic tank for the bathhouse). The cost of a septic tank with installation is about 100 thousand rubles. I learned from us in Kubinka - the production of septic tanks Yubas - Eurobion. I thought it was more important to use the last 100 thousand to move into the house than to have a septic tank and stay on the street.
The ceiling between the 1st and 2nd floors is made of reinforced concrete slabs. Fast, angry and reliable. The solution is clear if you imagine that there will be 3 children’s rooms above your head. All life! I think there is no room for error in terms of sound insulation. And then it will be necessary to modify the floor of the 2nd floor.
The result is that I did the project myself (except for the foundation), construction is planned in the mode of maximum rational economy.

5. Savings
Nobody believes me that for 1 million rubles I can build a house and live in it. I really won’t be able to build a house for 1 million. But theoretically I won’t be able to find more than 1.5 million, so this is my life’s task. I must say that this is real. It’s realistic in the sense that you need to understand where the money goes on construction and where you need to save. And I found this place. These are builders and they are paid for their work.
I met on the forum with, whose house is located 2 km from my village in neighboring SNT. The house is good. Also 2 full floors, size 9x9. Ytong material. In two years, he invested about 3 million in it. And he already lives in it. And approximately 40% of this amount went to pay for the work. Thus, in reality the house would have cost him no more than 2 million rubles if he had built it himself. And as you probably understand, I made a naive, in your opinion, decision to build myself. I agree that this is a utopia. But it’s worth thanking God, because this plan has slowly begun to come true. I paid 25 thousand rubles for the work on the foundation. I always have an Uzbek working at a construction site at a rate of 1,000 rubles per day. But the bulk of the work is done by my father-in-law, whom I already mentioned. Apparently this house will also serve as a monument to him, since he is the one who actually built it. I work on weekdays, leave for Moscow at 7-00 and arrive at the construction site at 19-30. Those who travel far to work will understand me; I arrive pretty tired. But I’m joining in the construction, this is a house for me and my family, who now lives in a village with an outdoor toilet and a Russian stove. This regime is very draining. I have already lost 7 kg in a month, despite the fact that excess weight I had almost none (well, maybe a maximum of 5 kg at the upper limit of normal). I won’t say that this is harmful to health, because now I’m normal, but there is a slight lack of sleep, because we work until the last minute, until the midge completely overcomes. In total, with such forces it is possible to erect the 1st floor under the ceiling, taking into account the cost of work on the foundation - no more than 50 thousand rubles. I believe in miracles! Probably my debt to my father-in-law in financial equivalent will be about half a million rubles if he manages the whole house in this mode. And morally, I am grateful to him for the rest of my life!
The result is that if you manage to build it yourself, the economic plan for the construction looks realistic.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered, finishing elements made of wood, manufactured locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family it was exactly this not an easy task. They had a foundation from an old burnt house, and a landscaped area around it! A new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, the style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans, installation of LVL beams. Basement ceiling insulated basalt insulation in 200mm; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build spacious house for the life of the whole family!
    Olga and other family members went from idea to implementation in several stages! Choice of technology long work on the project, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation- USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner of your own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to someone else to a good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies We have stepped forward so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    Owner of a house “individual 8x9m”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, work on a new stylish project It’s always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! Made the house even more spectacular vertical finishing imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.